We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Multi-storey car park.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Multi-storey car park Product List and Ranking from 4 Manufacturers, Suppliers and Companies

Multi-storey car park Product List

1~15 item / All 37 items

Displayed results

6-story 7-section multi-story parking lot stage W | Watanabe

Securing more parking spaces. Making the most of the site.

Traditionally, "general certification" for self-propelled multi-story parking garages could only accommodate up to 5 levels and 6 tiers. Therefore, for plans involving 6 levels and 7 tiers, it was necessary to resort to "individual certification," which significantly increased costs and duration. However, Watanabe Solutions has become the first in the industry to obtain "general certification" for 6 levels and 7 tiers. Moving forward, you will be able to plan and construct without incurring extra costs and time.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Public Parking Lot Construction Achievements: Self-Contained Multi-Story Parking Lot Yuken Park (1)

For public facility users! Here are examples of construction for the Tagajo Station South Multi-Storey Parking Lot.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a 5-story, 6-level continuous sloped parking facility for public facility users. An elevator building for parking users is located near the south exit of Tagajo Station. The second floor is equipped with a restroom for people with disabilities, and there is also a turning space for one car. 【Overview】 ■ Completion Date: March 31, 2016 ■ Location: Tagajo City, Miyagi Prefecture ■ Type: 5-story, 6-level continuous sloped ■ Purpose: For public facility users ■ Construction Area: 7,982.61 m² ■ Capacity: 351 cars *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Public Parking Lot Construction Achievements: Self-Contained Multi-Story Parking Lot Yuuken Park (5)

A parking lot that emphasizes landscape and safety, allowing direct access to each floor from the internal roads!

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. The rooftop level is usually available for parking, but this property has a roof specification. To promote energy efficiency, solar panels and green wall landscaping have been installed, and an automatic watering system has been set up to supply water to the planters in case they lack moisture. Additionally, a buzzer to notify when a vehicle is leaving and a vehicle control system that can detect the number of parked cars have been implemented. [Overview] - Completion Date: November 30, 2012 - Location: Morioka City, Iwate Prefecture - Type: 4-layer, 5-tier flat type - Use: Public (public works) - Construction Area: 3,454.75 m² - Capacity: 152 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuken Park (1)

A continuous sloped floor with a gentle gradient! Here are examples of construction for time-limited parking lots in Hamamatsu City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a time-based parking lot with ample space for families with children. The entrance and exit of the parking lot are adorned with louvers, and it features a gently sloping continuous inclined floor. Additionally, the fifth floor, designed for families with children, has a bright elevator hall decorated with illustrations for young children. The width of the parking spaces is 1.5 times the standard size. 【Overview】 ■ Completion Date: May 30, 2020 ■ Location: Hamamatsu City, Shizuoka Prefecture ■ Type: 5-story, 6-tier continuous inclined floor ■ Purpose: Time-based rental ■ Construction Area: 6,265.02 m² ■ Capacity: 262 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuuken Park (2)

Floors 1 to 2 are stores, and from the 3rd floor to the roof, it is a parking lot! Here are examples of construction for self-parking multi-story parking garages.

We would like to introduce a case study of the self-parking multi-story parking lot, Yuuken Park. It is a self-parking multi-story parking lot with stores on the 1st and 2nd floors. The entrance and exit of the 3rd-floor parking lot features gate-type parking equipment. It utilizes a continuous inclined floor system, maximizing the effective use of the site. 【Overview】 ■ Completion Date: October 31, 2019 ■ Location: Sumida Ward, Tokyo ■ Type: 5 levels, 6 tiers with stores (individually certified) ■ Purpose: For attracting customers and hourly rental ■ Construction Area: 9,189.01 m² ■ Capacity: 253 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuuken Park (3)

Bright staircase enclosed with louvers! Introducing the construction example of NPC 24H Hamamatsu Chitose-cho Parking.

Here is an introduction to the construction case of the self-driving multi-story parking lot, Yuuken Park. To alleviate congestion, the entrance features two lanes for parking. The stairwell is enclosed with metallic silver louvers, and the sidewalk facing the street has been landscaped. The continuous sloped floor design efficiently arranges the parking spaces. 【Overview】 ■ Completion Date: May 31, 2018 ■ Location: Hamamatsu City, Shizuoka Prefecture ■ Type: 4 levels, 5 tiers continuous sloped floor ■ Purpose: Hourly rental ■ Construction Area: 7,149.50 m² ■ Capacity: 344 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuuken Park (4)

Entrance and exit with maximum width secured! Introducing a construction case of the Keisei Narita Station parking lot.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. It is a parking facility that excels in convenience with its spacious environment and high-spec equipment. The entrance and exit have been designed to maximize width, connected directly to the station via a barrier-free accessible corridor. A vehicle number recognition system and pre-payment machines have been installed (with a left-side ticket machine for foreign cars), and some parking spaces accommodate long and wide spans. 【Overview】 ■ Completion Date: October 31, 2016 ■ Location: Narita City, Chiba Prefecture ■ Type: 5-story, 6-level continuous sloping floor (individually certified) ■ Purpose: Hourly rental ■ Construction Area: 10,314.16 m² ■ Capacity: 445 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (2)

A traffic light has also been installed in front of the slope! Introducing a construction case of the NTT Toyota Uji store's multi-story parking lot.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. To serve as a shared garage for the adjacent Store No. 2, we installed a cross-entry pathway and considered security measures for access to the upper floors, including shutters and external staircase doors. For stock purposes and to allow usage without area restrictions, the car stops are made of square pipe specifications, and a traffic light has also been installed in front of the ramp. 【Overview】 ■ Completion date: September 20, 2018 ■ Location: Uji City, Kyoto Prefecture ■ Type: 3-layer, 4-tier flat type ■ Use: Employee and business use ■ Construction area: 2,269.00 m² ■ Capacity: 107 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (4)

Install a blind on the straight staircase! A two-layer, three-step employee parking lot with a linear slope.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a two-layer, three-tier employee parking lot with a linear ramp. The ramp has a straight structure that allows direct access to the rooftop level. Since it is an employee parking lot, the parking spaces are arranged in a single line, and LED lighting illuminates the pedestrian walkway, along with privacy screens installed on the straight staircase. 【Overview】 ■ Completion Date: October 25, 2017 ■ Location: Nishinomiya City, Hyogo Prefecture ■ Type: Two-layer, three-tier flat type ■ Use: Employee and business use ■ Construction Area: 1,979.89 m² ■ Capacity: 108 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (5)

To enhance the visibility of oncoming vehicles, we have installed rotating lights! Here is a case study of the construction in the employee parking lot in Mito City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. We maximized the number of vehicles within the limited site area. In addition to height, weight, and speed restrictions, we installed operational awareness signage at the parking lot entrance. Due to height restrictions, the rooftop exterior wall was designed with a lattice railing. Furthermore, considering the neighbors, the stairs were finished with concrete instead of checker plates. 【Overview】 ■ Completion Date: January 31, 2016 ■ Location: Mito City, Ibaraki Prefecture ■ Type: 3-layer, 4-tier flat type ■ Purpose: Employee and business use ■ Construction Area: 2,160.25 m² ■ Capacity: 85 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Customer Attraction Construction Achievements】 Self-Driving Multi-Story Parking Lot Yuuken Park (4)

The entrance from the parking lot to the elevator building is installed every half floor! We will introduce examples of construction for commercial and public facility multi-story parking lots.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This parking lot is connected to commercial and public facilities via a pedestrian deck. The entrances to the elevator shaft are installed every half floor. The section facing the adjacent square employs a wire-based wall greening method. 【Overview】 ■ Completion Date: April 28, 2017 ■ Location: Aichi Prefecture ■ Type: 4-story, 5-tier skip floor type ■ Purpose: For attracting customers ■ Construction Area: 6,198.05 m² ■ Capacity: 273 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction achievements for parking lots in residential buildings: Yuuken Park (1) multi-story parking lot.

Installation of equipment such as distribution boards in dead space! Introducing a construction case of a parking lot for apartment buildings in Sendai City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a parking lot for a residential complex, featuring an exterior wall painted in a gradient of brown tones. An elevator shaft has been installed closer to the apartment building, and equipment such as distribution boards has been placed in the dead space under the stairs. To consider the neighbors, openings have been minimized to reduce light intrusion. 【Overview】 ■ Completion Date: March 31, 2020 ■ Location: Sendai City, Miyagi Prefecture ■ Type: 2-layer, 3-tier continuous sloped floor type ■ Purpose: For residential complexes ■ Construction Area: 2,244.67 m² ■ Capacity: 143 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Apartment Buildings】 Self-park Multi-story Parking Yuuken Park (2)

Introducing efficient vertical parking! We will showcase construction examples of self-parking facilities for condominiums in Kitakyushu City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a flat-type parking lot that incorporates efficient vertical parking. A canopy has been added to the outer perimeter where people enter and exit. The layout of the parking spaces maximizes the use of the site, and a roof has been provided for the stairs and the passage to the main building of the apartment. 【Overview】 ■ Completion date: March 22, 2019 ■ Location: Kitakyushu City, Fukuoka Prefecture ■ Type: 1-layer, 2-level flat type ■ Purpose: For residential apartments ■ Construction area: 1,072.01 m² ■ Capacity: 105 vehicles *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Amusement Stores】 Self-Contained Multi-Story Parking Lot Yuuken Park (3)

Spacious intermediate and rooftop floors! We present a case study of the self-parking multi-story parking garage at Mega M's 1121 Nishioka Store.

Here is an introduction to the construction case of the self-parking multi-story parking lot, Yuuken Park. It is a self-parking multi-story parking lot accessible from the first and second floors. The stairs are equipped with anti-slip measures, and both the intermediate and rooftop floors are spacious. Additionally, LED lighting has been adopted for the outdoor lights. 【Overview】 ■ Completion date: March 31, 2016 ■ Location: Sapporo City, Hokkaido ■ Type: 4-story, 5-tier continuous sloped floor type (snow load specification) ■ Purpose: For amusement stores ■ Construction area: 10,218.06 m² ■ Capacity: 459 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Free Distribution] Yamato Lease Self-Driving Multi-Story Parking Lot (Free Park) Case Study Collection

Minister of Land, Infrastructure, Transport and Tourism certification obtained for 6 layers and 7 stages. As a parking lot manufacturer, we are responding to diverse needs with meticulous attention at 48 business locations.

At Daiwa Lease's Leasing Solutions Division, we provide one-stop services for the planning, design, construction, and operation of automated multi-story parking garages. We also offer proposals for building inspections, repairs, and renovations of existing automated multi-story parking garages. With our extensive experience and know-how, we aim to provide proposals that satisfy our customers. Additionally, we actively propose parking facility development using the PFI method. 【Examples of Projects】 - Environmentally friendly parking garages - Parking garages for public facilities - Airport parking garages - Parking garages attached to bus terminals - Commercial facility parking garages - Hospital parking garages - Apartment building parking garages etc. *For more details, please download the PDF materials. Feel free to contact us as well.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration